Drug & alcohol testing built for mining operations
Meet site-access requirements with auditable random selections, on-site test logging, and compliance reports that satisfy any audit — from pit to port.
Meet every site-access and compliance requirement — without the admin burden
Stay in control of your testing program with the tools to select fairly, test on site, and report instantly.
- Prove every selection is fair — Cryptographically seeded random selections with a stored seed. Any auditor, union rep, or regulator can independently verify the result with one click.
- Stay on top of who's been tested — See real-time testing progress across every site. Know exactly who's been selected, who's been tested, and who's outstanding.
- Get audit-ready reports in seconds — Generate compliance, test history, and positive result reports filtered by site, department, or date range. Export to CSV instantly
- Eliminate manual processes — Automated schedules run selections on your behalf. No more spreadsheets, calendar reminders, or chasing testers for results.
A testing program that runs itself
Manage drug & alcohol testing across every site with tools built for how mining operations actually work.
Random selections
Select fairly, prove it easily
- Cryptographic algorithm with audit trail
- Filter by site, department, or job classification
- Select on-shift workers only via HR integrations
- Shareable verification links for external auditors
On-site test logging
Capture everything at the gate
- Log urine, oral fluid, or breath tests from mobile
- Attach result photos and ID photos
- Record GPS coordinates for every test
- Batch entry for high-volume pre-start screening
Compliance reporting
Always ready for an audit
- Compliance and test history reports by site
- Positive result and non-compliance tracking
- Results breakdown by type, outcome, and period
- Tester activity reports to verify program coverage
AI-Powered Insights
Ask questions about your testing program in plain English. FairTest’s AI assistant analyses your data and gives you instant answers — how many tests this quarter, which sites are behind schedule, or where positive results are trending.
"We went from tracking everything in Excel to having our entire testing program auditable in one platform. Our site audits take a fraction of the time now."
Safety Manager, Mining Company
Built for FIFO rosters, remote sites, and multi-contractor operations
Mining doesn’t run 9-to-5. FairTest adapts to how your workforce actually operates.
- Roster-aware selections — Integrates with UKG Ready, Deputy, Employment Hero, Dayforce, and Humanforce so you only select employees who are actually on site and on shift.
- Multi-site from one dashboard — Manage testing programs across every mine, plant, and port from a single account. Automated schedules rotate through locations on each run.
- Provider organisations — Third-party testing companies can manage selections and test logging across all their mining clients from one login, with per-client billing.
- Instant notifications — SMS alerts to selected workers, email notifications to site managers, safety leads, and HR the moment a selection is created.
- Works offline-ready on mobile — Your testers log results from the iOS or Android app — whether they're at the main gate or a remote processing plant.
Automated Selection Schedules
Set your testing frequency and let FairTest handle the rest. Daily, weekly, or monthly — selections run automatically, rotate through your sites, and assign to the right tester. Pause and resume around shutdowns with one click.
Mobile App for On-Site Testers
Your testers are at the gate, not behind a desk. FairTest’s mobile app lets them view selections, log test results, capture photos, and sync everything back — from any site, on any device.